Construction examples
BLUE FRONT SHIBAURA TOWER S
Minato-ku, Tokyo
- wall greening
- Adopted products
- Paravienna
- Payment period
- June 2025
- Construction area
- 990 m² (5th to 8th floors), 570 m² (exterior area), 60 m² (porte-cochère)
- Construction site
- Wall surfaces (recessed areas) on floors 5-8, exterior landscaping, and driveway.
Outline
The wall greenery features a checkerboard pattern created using Paravienta (recessed section: installed by our company) and protective planters (convex section), playing an important role in connecting the landscape and the architecture. On the Shinkansen side, the planting plan incorporates plants such as Nandina domestica and Trachelospermum asiaticum, allowing visitors to experience the changing seasons.
The photographs on this page may not be reproduced, copied, or reused without the permission of the copyright holder.





















