Rebro
NYK Systems:At Rebro 2021 (BIM for Facilities)
KYODO KY-TECBus duct BIM dataThank you.
About Rebro (BIM software)
What you can do within the software
- Bus duct capacity can be determined
- You can create Bus duct routes.
- Can be allocated to any size that can be manufactured
Supplemental Content
Provided BIM data E-BD type insulated Bus duct content
NYK Systems: Related software
Details
NYK Systems: Standard installation in the Rebro2021 software.
No need to download or install any additional libraries.
| 使用software | NYK Systems: Rebro (standard equipment from ver.2021) |
|---|---|
| Products offered | E-BD type insulated Bus duct (indoor: aluminum conductor only) |
| Provided model | Single-phase three-wire system, three-phase three-wire system, three-phase four-wire system |
| Grant information | 2D shape/3D shape/specifications/dimensions/delivery date/construction information |
| Drawing function | Capacity consideration/Route drawing/Allocation based on manufacturable dimensions |
A guide to the basic workflow using Rebro
- The scope of application of the guide is as follows:
- Please note that this does not apply to software or products outside the scope of application.
Scope of application
Software used: Rebro2021
Applicable products: E-BD type insulated Bus duct (indoor: aluminum conductor) - single-phase three-wire, three-phase three-wire, three-phase four-wire - This is an explanation of the basic procedure, so please consult with our staff for the actual procedure.
Please note that we cannot take any responsibility or guarantee for any problems or damages that may occur as a result of using this manual. - Use or misuse of data outside the relevant site is prohibited.
- If you have any questions or concerns, please contact our staff or fill out the form below.













