2026/09/28
Is a raised access floor (H=100mm) really necessary? We investigated the amount of wiring required in a new office building.
Raised Access Floor

Currently, many offices use raised access floors to house power and communication cables beneath the floor.
This might come as a surprise, but have you ever counted how many wires are housed inside that raised access floor?
Even if you've never counted them, you might assume that "the larger the office, the more wires there are," but is this really true?
To answer this question, we actually inspected the inside of the Raised Access Floor and conducted a survey of the amount of wiring.
This time, we will introduce the results of the first phase of the survey.
Overview of the survey building
The subject of this investigation is an office building located in Nibanchō, Chiyoda-ku, Tokyo, which was completed in August 2025.
The building's details are as follows:

Overview of the research floor
This time, we investigated two floors within the building with a large number of employees.
In this column, we will provide a detailed report on the results for the 9th floor, which had the largest amount of underfloor wiring among the two floors we surveyed.
Since it was an operational office, we did not enter the work area, but instead checked the number of wires leading to the work area and their storage location near the EPS adjacent to the corridor.
The 9th floor has 22 employees and a workspace area of 260m².2The average workspace area per person is approximately 11.8 m².2.
Looking at these conditions, try to imagine how much wiring is involved.

Wiring Quantity Survey Results (9th Floor)
Let's check the survey results for the 9th floor.
Since it is anticipated that wiring from the EPS (Electronic Power Supply) to the office will be concentrated there, the area in front of the EPS was chosen as the survey site.

The raised access floor used in this building is our "High-steel H=93mm" product.
The wiring grooves, measuring H74mm x W95mm (minimum dimensions), are arranged vertically and horizontally.
A 165mm wide feed-in channel (C channel) is positioned at the connection point with the EPS.
Upon removing the finishing materials and Raised Access Floor panels, we found that there were three openings extending from the EPS (Expanded Polystyrene) towards the corridor.
The wiring status and survey results for each opening are summarized in the image below.

The groove with the most wiring contained nine ICT cables (10P) and five (20P) cables.
On the other hand, unused grooves that did not contain any wiring were also observed.
Due to the bending and curvature of the wiring, there will be some discrepancies from the actual storage state, but calculating the sum of the cross-sectional areas from the outer dimensions of each cable yields approximately 2,564.8 mm².2.
The total cross-sectional area of the floor space with 6 grooves (A to F) used for wiring storage is 42,180 mm².2In comparison, the wiring cross-sectional area occupancy rate was approximately 6.1%.
A comparison based on cross-sectional area reveals that there is a relatively large amount of space under the floor.
Furthermore, within the area we inspected, we found that there were still unused wiring grooves remaining, indicating that there is room for future wiring expansion.
What if the network floor was 40 (H=40mm)?
This survey revealed that there is ample space within the floor when comparing the cross-sectional area of the wiring.
In past columns, I've introduced the Network Floor 40 several times along with the advantages of low-profile raised access floors (link). But what if the raised access floor in this case had been a Network Floor 40 with a height of 40mm?
Network Floor 40 and High-steel use different reference unit units, so a direct comparison is not possible.
Within the scope of this investigation, six of the feed-in channels before the EPS contained wiring.
When two units of the Network Floor Feed-in Mat 40N are placed side by side, six wiring grooves are formed, so we will compare them under these conditions.
The cross-sectional area of the floor space with two units of Feed-in Mat 40N (6 grooves) is 26,687 mm².2Therefore, the estimated area occupancy rate by wiring is approximately 9.6%.
Based on the cross-sectional area, it was confirmed that the necessary wiring space can be secured by using Feed-in Mat 40N for the amount of wiring confirmed in this study.
*For more information about feed-in mats, please see below.here
*Actual adoption requires individual consideration of factors such as cable type, bending radius, crossings, ease of installation, and future expansion capacity.
For reference, we checked the situation when the same amount of wiring as shown in photo ② of the survey results (VVF cable entry point) was stored in a Feed-in Mat 40N.
While a direct comparison is not possible due to differences in the dimensions and configuration of the standard units, we were able to confirm that the amount of power cables checked on the 9th floor allows for some leeway even when stored within one unit of the Feed-in Mat 40N.

Consider the height of the raised access floor based on the amount of wiring.
This time, we presented the results of a wiring quantity survey conducted at a newly constructed office building in Chiyoda Ward, Tokyo.
Based on our inspection, the percentage of underfloor space occupied by wiring was approximately 6.1%, and unused wiring grooves were still present.
This is just one example of a study, but when considering the height of a raised access floor, it is important to check not only the conventional standard dimensions but also the actual amount of wiring that is expected.
By reducing the height of the raised access floor according to the amount of wiring, it is expected that material usage and construction costs will be reduced.See previous columns.)
We will continue similar surveys in the future to clarify the current state of wiring in modern offices.
In addition, KYODO KY-TEC conducts health checkups for raised access floors.
If you would like to check the wiring situation at the same time as checking the condition of the floor,Please contact us for consultation..